Jump to content

IM-2

From Wikipedia, the free encyclopedia

IM-2 Athena
Mission typeLunar landing
OperatorIntuitive Machines
COSPAR ID2025-038A Edit this at Wikidata
SATCAT no.63099Edit this on Wikidata
Mission duration8 days, 5 hours, 59 minutes
Spacecraft properties
SpacecraftAthena
Spacecraft typeNova-C
ManufacturerIntuitive Machines
Launch mass2,120 kg (4,670 lb)[1]
Start of mission
Launch dateFebruary 27, 2025, 00:16:30 UTC[2]
RocketFalcon 9 Block 5 (B1083.9)
Launch siteKennedy, LC-39A
ContractorSpaceX
End of mission
Last contactMarch 7, 2025, 06:15 UTC[3][4][5]
Lunar lander
Landing dateMarch 6, 2025,
Landing siteMons Mouton[6]
(84°47′26″S 29°11′45″E / 84.7906°S 29.1957°E / -84.7906; 29.1957)[7]

IM-2 mission insignia
Motto: INTER LUCEM ET TENEBRAS
(Between Light and Darkness)

IM-2 was a lunar mission run by Intuitive Machines as part of NASA's Commercial Lunar Payload Services (CLPS) program.[8][9] It was launched on February 27, 2025, at 00:16:30 UTC. The Nova-C lunar lander, named Athena, reached the surface of the Moon on March 6, 2025, at 17:28:50 UTC. Contact was temporarily lost during the landing process; when it was re-established, it indicated that the spacecraft was not in the correct orientation and one of the two radio antennas was not operating. The sideways orientation prevented the spacecraft from generating sufficient power. By March 7, Athena's power had been fully depleted and was not expected to replenish, bringing the mission to an end.[3][4]

Athena was designed to investigate the presence and quantity of lunar water ice using PRIME-1, a payload of a drill and mass spectrometer. Athena also carried a drone that was equipped with a neutron spectrometer to explore the permanently shadowed region (PSR) of Marston crater near the landing site.[3] The mission aimed to measure hydrogen in the PSR, looking for indications of solid water ice.[10][11]

Background

[edit]

NASA uses its CLPS program to partner with commercial providers to fly experiments to the Moon.[12] A drilling mission was originally set to launch in December 2022,[13] for which Intuitive Machines supplied its Nova-C as the lander.[14] This was the company's second CLPS contract.[13]

Three CLPS launches preceded IM-2:

  1. Astrobotic Technology's Peregrine in January 2024 failed shortly after launch and did not reach the Moon.[15]
  2. Intuitive Machines' IM-1 in February 2024 placed the Odysseus lander on the Moon, but the landing was rougher than expected, causing the spacecraft to tip over; however, the company deemed the mission "successful".[16]
  3. Firefly Aerospace's Blue Ghost Mission 1 landed without problems on March 2, 2025.

This IM-2 mission on February 27, 2025 was the fourth CLPS launch, and was en route to the Moon when the Blue Ghost landing occurred.[8][9]

Payloads

[edit]

Nova-C lander

[edit]

A CLPS contract was awarded to IM in October 2020 to land a second Nova-C lander near the lunar south pole. NASA designated the landing site at a ridge near the Shackleton crater, where there could be ice below the surface.[17] After the rough landing of IM-1, several adjustments were made, including improvements to the primary laser rangefinder system, which helps determine variables such as altitude and horizontal velocity.[18]

The MiniPIX TPX3 SPACE payload, provided by the Czech company ADVACAM, was onboard the Nova-C lunar lander. This payload is designed to monitor the radiation field on the Moon and help understand how to protect crew and equipment from the negative effects of cosmic rays. This marks the first Czech payload planned to be delivered to the Moon's surface.[19]

Micro-Nova ("Grace")
Mission typeLunar hopper
COSPAR ID2025-038A Edit this at Wikidata
SATCAT no.63099Edit this on Wikidata
Spacecraft properties
ManufacturerIntuitive Machines
Payload mass1 kg
Start of mission
RocketFalcon 9 Block 5
Launch siteKennedy, LC-39A
Moon rover
Landing siteShackleton connecting ridge

During the mission, IM would deploy a second vehicle, its μNova (Micro-Nova) Hopper. Micro-Nova would separate from the Nova-C lander after landing and function as a standalone hopper lander, exploring multiple difficult-to-reach areas such as deep craters on the lunar surface,[20][21] by firing hydrazine rockets in controlled bursts to propel itself short distances. It would hop across craters in search of lunar ice, which could contain water critical to future crewed missions to the Moon.[22] Water ice could be processed into rocket propellant or used to support a permanent lunar habitat in the future. Micro-Nova is also planned to take the first pictures from inside craters at the lunar south pole and would be able to carry a 1-kilogram payload for more than 25 kilometers. The hopper would explore permanently shaded regions and could "fly into a lava tube and report images back", according to IM co-founder and CTO Tim Crain.[23][24]

MAPP
Mission typeLunar rover
COSPAR ID2025-038A Edit this at Wikidata
SATCAT no.63099Edit this on Wikidata
Spacecraft properties
ManufacturerLunar Outpost
Landing mass5–10 kg
Payload mass15 kg
Start of mission
Launch dateFebruary 27, 2025
RocketFalcon 9 Block 5
Launch siteKennedy, LC-39A
Moon rover
Landing siteMons Mouton
Instruments
RESOURCE
AstroAnt
Mission typeLunar rover
COSPAR ID2025-038A Edit this at Wikidata
SATCAT no.63099Edit this on Wikidata
Spacecraft properties
ManufacturerMIT
DimensionsThe size of a matchbox
Start of mission
Launch dateFebruary 27, 2025
Launch siteKennedy, LC-39A
Moon rover
Landing siteMons Mouton

Space technology company Lunar Outpost would send their first lunar rover, the Mobile Autonomous Prospecting Platform (MAPP), on this mission in partnership with Nokia Bell Labs, Quantum Aerospace, and IM. MAPP would collect lunar samples for NASA under a contract worth just $1, which is symbolic of a new incentive for the emerging commercial space industry to access resources in space.[25][26] MAPP would have a mass of 5–10 kilograms, a payload mass of up to 15 kilograms, and a top speed of 10 cm/s.[27][28] On its multi-day journey, the rover would autonomously map the lunar surface, capture stereo images and thermal data, and inspect samples of lunar regolith in a special bin mounted on its wheels. Photos of the samples and other data would be transmitted through radio equipment and antennas to communicate with the Nova-C lander.[22] MAPP would snap 3D images and record videos using the RESOURCE camera, developed by MIT. It would also deploy MIT's AstroAnt, a miniature rover the size of a matchbox, to conduct contactless temperature measurements as it drives around on MAPP's roof.[25][22][29][30]

A collaboration in order to demonstrate 4G cellular connectivity, in partnership with Nokia Bell Labs and NASA was aboard the lander.[31] Nokia's equipment was a Network-In-a-Box and would connect the Nova-C lander with Lunar Outpost's MAPP rover and IM's Micro-Nova Hopper. This 4G/LTE network would provide more bandwidth than the more conventional ultra-high frequency (UHF) systems used for space communication. Nokia says they hope that future missions would use shared infrastructure to interlink bases on the lunar surface.[32]: 33 

Yaoki rover

[edit]

IM-2 carried the Moon rover Yaoki. It was made by Japanese company Dymon [ja] and weighed 498 grams.[33][34][35][36]

PRIME-1

[edit]

The primary payload, Polar Resources Ice Mining Experiment-1 (PRIME-1) was designed to search for water ice on the Moon at a permanently shadowed location near Shackleton Crater. It included the TRIDENT ice drill to sample ice from below the lunar surface and the MSolo mass spectrometer to measure the amount of ice in the samples.[37][38] ILO-1 prime contractor Canadensys was working to deliver "a flight-ready low-cost optical payload for the ILO-1 mission, ruggedized for the Moon South Pole environment".[39] On February 27, IM-2 released photography taken with the help of Canadensys technology.[40] In November 2023, a mission simulation was undertaken by engineers at the Kennedy Space Center.[41]

Instruments

[edit]
Engineers prepare the Mass Spectrometer Observing Lunar Operations (MSolo) instrument

The mission was to measure the volatile content of subsurface samples on the Moon. The scientific equipment consisted primarily of two components mounted to the lander:[42][43][44]

  • The Regolith and Ice Drill for Exploring New Terrain (TRIDENT): TRIDENT would have drilled up to three feet deep, extracting lunar regolith, or soil, up to the surface. The instrument could drill in multiple segments, pausing and retracting to deposit cuttings on the surface after each depth increment.
  • Mass Spectrometer observing lunar operations (MSolo): This modified-for-spaceflight, commercial-off-the-shelf mass spectrometer would have evaluated the drill cuttings for water and other chemical compounds. Soil samples from multiple depths would have been analyzed.[45]

A version of TRIDENT and MSolo was to be used on NASA's canceled VIPER rover in the search for water ice.[46]

PRMIE-1 weighed 40 kg (88 lb).[47] It was to investigate in situ resource utilization (ISRU).[37]

Mission events

[edit]

Prior to launch

[edit]

In May 2024, the company announced that IM-2 was entering the final assembly stage.[48] It was also reported that the company was upgrading both software and hardware, including the landing legs in order for better precision and control during descent and landing on the IM-2 mission.[49] In September 2024, the company said it was on track for launch in January 2025.[8] The Lunar Trailblazer orbiter was a secondary payload on the same Falcon 9 launch.[37] In November 2024, during an earnings call, Intuitive Machines said the launch of IM-2 was targeting February 2025.[9]

During mission planning, IM-2 intended to land at Shackleton connecting ridge.[50] Nevertheless, prior to launch, the targeted landing site was changed to Mons Mouton,[6] a high plateau near the Lunar south pole which was planned to be the landing site of the canceled VIPER rover.

Launch

[edit]

IM-2 launched on February 27, 2025, at 00:16 UTC, aboard a SpaceX Falcon 9 with a number of other payloads. Following an on-target orbital insertion, Athena deployed 45 minutes after launch and established contact with ground controllers at 01:17 UTC. It was confirmed the next morning that the IM-2 mission was on track for a lunar orbital insertion on March 3, with a landing attempt scheduled for March 6 at 17:31 UTC.[51][52]

Landing

[edit]

Three minutes before touchdown at 17:27 UTC on March 6, Athena entered terminal descent. A plume of lunar dust interfered with its navigation systems, obscuring laser and rangefinder readings while also disrupting radio signals. After a brief period of no communication, mission controllers confirmed that Athena had landed, detected lunar gravity, and was generating power. However, one of its two radio antennas had lost signal, and power generation was lower than expected. The Intuitive Machines team placed Athena in a power-saving "safe mode," but after 38 minutes of troubleshooting, they determined the lander was not receiving sufficient energy.[53]

At a 21:00 UTC press conference, Intuitive Machines CEO Steve Altemus said that Athena was not "in the correct attitude," meaning its solar panels were not facing the Sun. Despite this, the lander had begun performing scientific experiments, though at limited capacity due to the power constraints. On March 7, downlinked images confirmed that Athena had come to rest sideways in a shadowed crater where the temperature was −173 °C (−280 °F).[53][54] With the solar arrays producing only about 100 watts of power—insufficient to operate both the spacecraft’s heaters and its high-gain antenna—mission operators opted to maximize data collection over a 13-hour period rather than run the heaters to extend operations, but with minimal ability to conduct scientific experiments. During this time, Athena transmitted imagery and data from the Moon’s south pole. The TRIDENT drill was extended but not operated, and private customers, including Nokia, retrieved useful data from their payloads. However the rovers and Micro-Nova were not able to be deployed.[54]

On March 13, Intuitive Machines shared that, like on the IM-1 mission, the Athena's altimeter had failed during landing, leaving its onboard computer without an accurate altitude reading. As a result, the spacecraft struck a plateau, tipped over, and skidded across the lunar surface, rolling once or twice before settling inside a crater. The company's CEO compared it to a baseball player sliding into a base. The impact also kicked up regolith that coated the solar panels in dust, further degrading their performance.[54]

Post-mission

[edit]

On March 7, 2025, at 16:54:21 UTC, the Lunar Reconnaissance Orbiter (LRO) imaged the Athena spacecraft landed within the center of a 20 m (66 ft) wide crater, about 23.5 hours after it touched down the lunar surface.[7] The orbiter subsequently imaged the lander again at a much more oblique angle on March 10.[55]

On March 7, 2025, Intuitive Machines announced that the mission was over after Athena landed on its side in the Mons Mouton region near the south pole of the Moon. The same day, NASA confirmed that lander operations ended at 1:15 a.m., less than 13 hours after landing.[56]

See also

[edit]

References

[edit]
  1. ^ G. D. Krebs. "Nova-C IM-2 (PRIME 1, CLPS 3, Athena)". Gunter's Space Page. Archived from the original on February 16, 2025. Retrieved March 11, 2025.
  2. ^ "PRIME-1 (IM-2)". nextspaceflight.com. Archived from the original on July 8, 2023. Retrieved January 14, 2025.
  3. ^ a b c "IM-2". intuitivemachines.com. Archived from the original on February 28, 2025. Retrieved February 27, 2025.
  4. ^ a b J. Wattles (March 7, 2025). "Lying sideways on the moon, the Athena lander is declared dead". CNN. Archived from the original on March 8, 2025. Retrieved March 8, 2025.
  5. ^ T. P. Doyle (March 7, 2025). "NASA Receives Some Data Before Intuitive Machines Ends Lunar Mission". nasa.gov. NASA. Archived from the original on March 7, 2025. Retrieved March 8, 2025. Public Domain This article incorporates text from this source, which is in the public domain.
  6. ^ a b J. Wattles (February 26, 2025). "Texas-based company that made historic soft touchdown on the moon launches high-stakes lunar excursion". CNN. Archived from the original on February 27, 2025. Retrieved February 27, 2025.
  7. ^ a b M. Robinson (March 7, 2025). "IM-2 Athena Seen Obliquely". www.lroc.asu.edu. University of Arizona. Retrieved March 11, 2025.
  8. ^ a b c David, Leonard (September 12, 2024). "Ice-hunting Lunar Trailblazer and IM-2 nearly ready for January 2025 launch". SpaceNews. Retrieved September 12, 2024.
  9. ^ a b c "Launch of Intuitive Machines' Athena lander is targeted for no earlier than late February". intuitivemachines.com. January 7, 2025. Archived from the original on January 9, 2025. Retrieved January 7, 2025.
  10. ^ David, Leonard (June 14, 2024). "Moon ice in the Artemis era: what we still don't know". spacenews.com. Retrieved June 16, 2024.
  11. ^ "NASA, Intuitive Machines Announce Landing Site Location for Lunar Drill". nasa.gov. November 3, 2021. Archived from the original on April 28, 2024. Retrieved June 16, 2024. Public Domain This article incorporates text from this source, which is in the public domain.
  12. ^ "NASA Selects Intuitive Machines to Land Water-Measuring Payload PRIME-1 on the Moon". SciTechDaily. October 18, 2020. Retrieved December 19, 2024.
  13. ^ a b Machines, Intuitive (October 16, 2020). "NASA Selects Intuitive Machines to Deliver Lunar Ice Drill in 2022". Intuitive Machines. Retrieved December 19, 2024.
  14. ^ Tariq Malik (October 22, 2020). "NASA picks Intuitive Machines to land an ice-mining drill on the moon". Space.com. Retrieved December 19, 2024.
  15. ^ J. Foust (January 20, 2024). "Astrobotic to begin formal investigation into failed Peregrine mission". SpaceNews.com. Retrieved May 9, 2024.
  16. ^ "Intuitive Machines calls IM-1 a successful moon-landing mission". MyNews13.com. Retrieved May 9, 2024.
  17. ^ Smith, Hilary (November 3, 2021). "NASA, Intuitive Machines Announce Landing Site Location for Lunar Drill". nasa.gov. NASA. Retrieved May 10, 2024. Public Domain This article incorporates text from this source, which is in the public domain.
  18. ^ Aria Alamalhodaei (March 21, 2024). "Intuitive Machines' second moon mission on track for 2024". techcrunch.com. Retrieved May 10, 2024.
  19. ^ "Advacam – MiniPIX TPX3 Space". Archived from the original on November 1, 2023. Retrieved November 2, 2023.
  20. ^ "Intuitive Machines to Deploy and Operate First Lunar Communication Satellite in 2022". intuitivemachines.com. Intuitive Machines. June 21, 2021. Archived from the original on June 21, 2021. Retrieved June 22, 2021.
  21. ^ "Lunar Services – Getting Around – Extreme Lunar Surface Mobility". intuitivemachines.com. Intuitive Machines. Archived from the original on June 28, 2021. Retrieved June 22, 2021.
  22. ^ a b c "An inside look at Nokia's Moon mission". nokia.com. Nokia. July 25, 2023. Archived from the original on May 3, 2024. Retrieved April 30, 2024.
  23. ^ Keith Cooper (January 8, 2023). "What is Intuitive Machines and how is it aiming for the moon?". space.com. Archived from the original on May 10, 2024. Retrieved May 10, 2024.
  24. ^ "Intuitive Machines and NASA Finalize Contract for Extreme Lunar Mobility Spacecraft". intuitivemachines.com. Intuitive Machines. July 21, 2021. Archived from the original on April 25, 2024. Retrieved May 10, 2024.
  25. ^ a b Arianna Johnson (November 9, 2022). "MIT Will Return To The Moon For The First Time Since Apollo, Thanks To This Space Startup". Forbes. Retrieved April 30, 2024.
  26. ^ Catherine Thorbecke (December 5, 2020). "NASA will pay a firm $1 to go to the moon and get a sample". abcnews.go.com. ABC News. Archived from the original on April 30, 2024. Retrieved April 30, 2024.
  27. ^ "Rovers". lunaroutpost.com. Archived from the original on September 8, 2024. Retrieved April 30, 2024.
  28. ^ Aria Alamalhodaei (July 14, 2022). "Lunar Outpost eyes up first-mover advantage for moon markets". techcrunch.com. Archived from the original on April 30, 2024. Retrieved April 30, 2024.
  29. ^ "AstroAnt". media.mit.edu. MIT Media Lab. Archived from the original on June 16, 2024. Retrieved April 30, 2024.
  30. ^ Stefanie Waldek (April 30, 2024). "Private moon lander will carry Nokia's 4G cell network to the lunar surface this year". space.com. Archived from the original on May 7, 2024. Retrieved April 30, 2024.
  31. ^ Jack Bantock (April 24, 2024). "Streaming and texting on the Moon - Nokia and NASA are taking 4G into space". cnn.com. CNN. Archived from the original on April 27, 2024. Retrieved April 27, 2024.
  32. ^ "IM-2 Press Kit" (PDF). Intuitive Machines. Retrieved March 8, 2025.
  33. ^ Wall, Mike (October 18, 2019). "Japan's 1st Moon Rover to Touch Down in 2021". Space.com.
  34. ^ "Astrobotic and Dymon Announce Agreement to Bring the First Japanese Lunar Rover to the Moon". www.astrobotic.com. October 14, 2019.
  35. ^ "YAOKI - Japanese Lunar Rover". dymon.co.jp. February 15, 2021. Archived from the original on February 28, 2025. Retrieved February 28, 2025.
  36. ^ "Japan's 1st Moon Rover to Touch Down in 2021". freepressweb.blog. October 21, 2019. Archived from the original on October 22, 2021. Retrieved February 28, 2025.
  37. ^ a b c "Intuitive Machines 2 (PRIME 1)". nssdc.gsfc.nasa.gov. NASA. Archived from the original on May 24, 2022. Retrieved May 9, 2024. Public Domain This article incorporates text from this source, which is in the public domain.
  38. ^ Brown, Katherine (October 16, 2020). "NASA Selects Intuitive Machines to Land Water-Measuring Payload on the Moon". nasa.gov. NASA. Archived from the original on October 18, 2020. Retrieved November 15, 2020. Public Domain This article incorporates text from this source, which is in the public domain.
  39. ^ "The ILO Mission – ILOA Hawai'i". April 7, 2021. Archived from the original on November 3, 2021. Retrieved September 22, 2023.
  40. ^ Boucher, Marc (February 28, 2025). "Intuitive Machines IM-2 mission update with stunning images". SpaceQ Media Inc. Retrieved March 12, 2025.
  41. ^ "PRIME-1 Simulation". Moon Daily. Retrieved December 19, 2024.
  42. ^ "Polar Resources Ice Mining Experiment 1 (PRIME-1) - NASA". Retrieved December 19, 2024.
  43. ^ "Falcon 9 Block 5 | PRIME-1 (IM-2)". nextspaceflight.com. Retrieved December 19, 2024.
  44. ^ "Nova-C IM-2 (PRIME 1, CLPS 3)". Gunter's Space Page. Retrieved December 19, 2024.
  45. ^ Polar Resources Ice Mining Experiment-1 Public Domain This article incorporates text from this source, which is in the public domain.
  46. ^ Malik, Tariq (October 23, 2020). "NASA picks Intuitive Machines to land an ice-mining drill on the moon". Space.com. Retrieved May 17, 2024.
  47. ^ "NASA Asks Commercial Partners to Land Water-Measuring Drill on Moon - NASA". July 29, 2020. Retrieved December 19, 2024.
  48. ^ Intuitive Machines [@Int_Machines] (May 7, 2024). "Like cars on Earth, we monitor our spacecraft's temperatures in space. Engineers installed these tank sensors before starting the final assembly of our soon-to-be-named IM-2 mission lunar lander" (Tweet) – via Twitter.
  49. ^ J. Foust (May 14, 2024). "Intuitive Machines making upgrades to second lunar lander". SpaceNews. Retrieved May 15, 2024.
  50. ^ Intuitive Machines [@Int_Machines] (May 9, 2024). "Featured in the fiction television series #ForAllMankind, our non-fiction IM-2 mission is targeting a ridge not far from the Shackleton crater referred to as the "Shackleton connecting ridge", which could have water ice below its surface" (Tweet) – via Twitter.
  51. ^ Wattles, Jackie (March 6, 2025). "Intuitive Machines' Athena lunar lander heads in for moon landing attempt". CNN. Archived from the original on March 7, 2025. Retrieved March 6, 2025.
  52. ^ "Intuitive Machines' IM-2 Lunar Lander Successfully Commissioned and En Route to the Moon". investors.intuitivemachines.com. February 27, 2025. Retrieved February 27, 2025.
  53. ^ a b Wattles, Jackie. "Intuitive Machines attempts to land historic water-hunting mission on the moon". CNN. Retrieved March 6, 2025.
  54. ^ a b c Berger, Eric (March 13, 2025). "Athena landed in a dark crater where the temperature was minus 280° F". Ars Technica. Retrieved March 13, 2025.
  55. ^ M. Robinson (March 10, 2025). "IM-2 Athena: A Closer View". www.lroc.asu.edu. University of Arizona. Retrieved March 12, 2025.
  56. ^ J. Foust (March 7, 2025). "IM-2 lunar lander mission ends". SpaceNews. Retrieved March 11, 2025.
[edit]